DPC Enterprises Festus Chlorine Release
Festus, MO · August 14, 2002
What happened
On August 14, 2002, a chlorine transfer hose ruptured during a rail car unloading operation at the DPC Enterprises chlorine repackaging facility near Festus, Missouri. The hose rupture ultimately led to the release of 48,000 pounds of chlorine, causing three workers and 63 residents to seek medical treatment.
Summary by the US Chemical Safety Board.
Lessons
Hominin's reading of what the investigation asks others to change. Each lesson names the recommendations it comes from.
Verify that the hose is the right hose
A chlorine transfer hose ruptured while a rail car was being unloaded. Recommendations asked the facility, the hose maker and industry groups to adopt quality checks and continuous positive identification so hoses are made of the right materials.
From recommendations 2002-04-I-MO-1, 2002-04-I-MO-11, 2002-04-I-MO-18, 2002-04-I-MO-22
Emergency shutdown valves must actually close
The facility was asked to verify that its emergency shutdown valves close as intended, and the chlorine industry institute to publish testing, inspection and maintenance practices for those systems.
From recommendations 2002-04-I-MO-2, 2002-04-I-MO-20
Keep moisture out of dry chlorine systems
The facility was asked to address moisture-related corrosion in its chlorine transfer system, and the industry institute to write recommended practices for moisture in dry chlorine piping.
From recommendations 2002-04-I-MO-3, 2002-04-I-MO-19
Warn the neighbors immediately
The county emergency management agency was asked to work with the company on a system that immediately alerts nearby residents and businesses of a chemical release, and to improve response across neighboring jurisdictions.
From recommendations 2002-04-I-MO-12, 2002-04-I-MO-13
Safety recommendations
The CSB made 24 recommendations; none is still open.
To Agency for Toxic Substances and Disease Registry (ATSDR)
- 2002-04-I-MO-17Closed - No Longer Applicable
Work with State and local agencies to address concerns about the long-term health effects of the chlorine release in Festus, Missouri, and communicate your findings to the community.
To Branham Corporation
- 2002-04-I-MO-11Closed - Acceptable Action
Implement a materials verification procedure to improve quality assurance during chlorine transfer hose fabrication and shipment, such that hoses shipped to customers are readily identifiable and meet required specifications.
To Chlorine Institute
- 2002-04-I-MO-18Closed - Acceptable Action
Work with the Association of Hose and Accessories Distributors (NAHAD) and chlorine hose manufacturers, such as Crane-Resistoflex, to develop and implement a recommended practice requiring continuous positive identification (e.g., coding, stenciling, stamping) throughout the supply chain, from manufacturing to the end user of the product.
- 2002-04-I-MO-19Closed - Acceptable Action
Develop recommended practices to address moisture in dry chlorine piping systems. Include information on suggested material specifications, prevention and corrective measures, and adverse consequences (particularly for emergency shutdown [ESD] systems).
- 2002-04-I-MO-20Closed - Acceptable Action
Develop recommended practices for testing, inspection, and preventative maintenance of ESD systems for bulk transfer of chlorine.
- 2002-04-I-MO-21Closed - Acceptable Action
Communicate the findings and recommendations of this report to your membership.
To DPC Enterprises, Festus Site
- 2002-04-I-MO-1Closed - Acceptable Action
Revise the mechanical integrity program: Develop and implement a quality assurance management system, such as positive materials identification, to confirm that chlorine transfer hoses (CTH) are of the appropriate materials of construction.
- 2002-04-I-MO-2Closed - Acceptable Action
Revise the mechanical integrity program: Implement procedures and practices to ensure the emergency shutdown (ESD) system operates properly. Include procedures to verify that the ESD valves will close to shut down the flow of chlorine.
- 2002-04-I-MO-3Closed - Acceptable Action
Revise the mechanical integrity program: Revise the preventive maintenance and inspection program for the chlorine transfer system to address moisture-related corrosion. Evaluate and correct any problems associated with corrosion that could potentially lead to chlorine transfer and safety system failure.
- 2002-04-I-MO-5Closed - Acceptable Action
Revise the Emergency Response Plan: Develop procedures to clearly designate the roles and responsibilities of facility emergency response personnel, including post-incident remediation.
- 2002-04-I-MO-6Closed - Acceptable Action
Revise the Emergency Response Plan: Develop and implement a timetable for drills to test emergency response personnel on various levels of response, including a large uncontrolled release that could affect the public. Coordinate these drills with local emergency response authorities. Provide a copy of the revised Emergency Response Plan to the local emergency planning committee, and review the plan with the committee and the local fire department. Work with these authorities to implement an improved community emergency notification system.
- 2002-04-I-MO-7Closed - Acceptable Action
Revise the Emergency Response Plan: Improve accessibility of equipment required for emergency response, considering likely response scenarios.
- 2004-04-I-MO-4Closed - Acceptable Action
Revise the mechanical integrity program: Require periodic inspection of the above critical safety systems by the operations or facility manager.
To DX Group
- 2002-04-I-MO-8Closed - Acceptable Action
In light of the findings of this report, conduct periodic audits of the safety management systems involved in this incident, such as mechanical integrity, emergency response, and material quality assurance. Ensure that the audit recommendations are tracked and implemented. Share findings and recommendations with the work force at your repackaging facilities.
- 2002-04-I-MO-9Closed - Acceptable Action
To improve supervision of day-to-day operations, revise your corporate safety management training program on chlorine repackaging operations. Emphasize safety critical systems, including verification of safety system performance.
- 2002-04-I-MO-10Closed - Acceptable Action
Communicate the findings and recommendations of this report to all DPC facilities.
To Jefferson County Emergency Management Agency (EMA)
- 2002-04-I-MO-12Closed - Acceptable Action
Work with DPC to implement a community notification system that will immediately alert neighboring residents and businesses of a chemical release.
- 2002-04-I-MO-13Closed - Acceptable Action
Work with DPC, local emergency planning and response authorities in Jefferson and adjacent counties, the City of Festus, and Crystal City to improve overall response and mitigation time.
- 2002-04-I-MO-14Closed - Acceptable Action
Communicate the findings and recommendations of this report to your membership.
To Missouri Department of Natural Resources (DNR) and other Appropriate Agencies
- 2002-04-I-MO-16Closed - No Longer Applicable
In collaboration with appropriate agencies, hold a community meeting in Festus, Missouri, to hear concerns raised by local citizens affected by the DPC incident and to respond to issues raised by the community.
To Missouri State Emergency Response Commission (MERC)
- 2009-04-I-MO-15Closed - Acceptable Action
Communicate the findings and recommendations of this report to local emergency planning committees (LEPC), emergency management agencies (EMA), and local fire departments.
To National Association of Chemical Distributors (NACD)
- 2009-04-I-MO-24Closed - Acceptable Action
Communicate the findings and recommendations of this report to your membership.
To National Association of Hose and Accessories Distributors (NAHAD)
- 2002-04-I-MO-22Closed - Acceptable Action
Work with The Chlorine Institute and chlorine hose manufacturers, such as Crane-Resistoflex, to develop and implement a recommended practice requiring continuous positive identification (e.g.,coding, stenciling, stamping) throughout the supply chain, from manufacturing to the end user of the product.
- 2009-04-I-MO-23Closed - Acceptable Action
Communicate the findings and recommendations of this report to your membership.
More release investigations
- PEMEX Deer Park Chemical Release · Deer Park, TX, 2024
- Cuisine Solutions Ammonia Release · Sterling, VA, 2024
- TS USA Molten Salt Eruption · Chattanooga, TN, 2024
- Honeywell Geismar Chlorine and Hydrogen Fluoride Releases · Geismar, LA, 2023