Skip to main content

Release

Cuisine Solutions Ammonia Release

Sterling, VA · July 31, 2024

What happened

A July 31, 2024, ammonia release at Cuisine Solutions, Inc., a food processing facility in Loudon County, VA led to forty people being evaluated at local hospitals. Of those, four were admitted, one to the Intensive Care Unit. The facility is a commercial food preparation plant with approximately 350 employees located about 30 miles from Washington D.C.

Summary by the US Chemical Safety Board.

Lessons

Hominin's reading of what the investigation asks others to change. Each lesson names the recommendations it comes from.

  1. Relief valves must discharge somewhere safe

    The plant was asked to prevent or mitigate liquid or two-phase discharges from its ammonia emergency relief system, and the refrigeration standard to require checking, for example with a dispersion analysis, that relief devices discharge to a safe location.

    From recommendations 2024-03-I-VA-3, 2024-03-I-VA-1, 2024-03-I-VA-2

  2. Workers need an ammonia alarm and a plan

    The plant was asked to add alarms specific to ammonia releases so workers can respond properly, and to update its emergency action plan using ammonia refrigeration emergency planning guidance.

    From recommendations 2024-03-I-VA-6, 2024-03-I-VA-5

  3. Record what the process is doing

    The plant was asked to put in an electronic process data historian so that critical process parameters are collected, tracked and stored.

    From recommendation 2024-03-I-VA-4

Safety recommendations

The CSB made 6 recommendations; 5 are still open.

To Cuisine Solutions Inc. Sterling Site

  • 2024-03-I-VA-3Open - Awaiting Response or Evaluation/Approval of Response

    Reduce the likelihood or mitigate the consequences of liquid or two-phase atmospheric discharges from the ammonia refrigeration emergency pressure relief system at the Sterling plant. At a minimum: a. Identify liquid or two-phase release scenarios, particularly for horizontal surge drums and other vessels containing saturated liquid with little vapor space; b. Implement engineering controls to reduce the likelihood of high liquid level, overfill, or boiling overpressure scenarios; c. Implement engineering controls to mitigate the consequences of these scenarios where their likelihood cannot be acceptably reduced, such as through emergency pressure control systems, atmospheric knockout drums, or automatic shutdown systems; and d. Contract a competent third party to audit the pressure relief systems. The audit should ensure that (i) all relevant relief scenarios have been identified, (ii) preventive and mitigative engineering controls adequately address the hazards, and (iii) engineering controls are maintained in such a way that they function properly when required.

  • 2024-03-I-VA-4Closed - Acceptable Action

    Implement an electronic process data historian and management system to ensure that critical process parameters are collected, tracked, and stored. The system should be available to refrigeration technicians so that they can monitor the refrigeration system and respond to and investigate process upsets.

  • 2024-03-I-VA-5Open - Acceptable Response or Alternate Response

    Update the Cuisine Solutions Sterling site’s Emergency Action Plan using guidance such as the IIAR’s Critical Task Guidance for Ammonia Refrigeration System Emergency Planning. At a minimum, the updated plan should: a. Address indoor and outdoor ammonia releases separately, including the distinct alarms and responses to them; b. Clearly specify appropriate evacuation routes and muster points, including alternates; c. Provide guidance for using windsocks to remain upwind of a release during evacuation; d. Implement shelter-in-place strategies, emergency protective equipment, and emergency shutdowns, as appropriate; and e. Include requirements to conduct annual ammonia release drills that include all onsite personnel (including corporate employees). The annual drills should include separate indoor and outdoor ammonia release scenarios and address the use of windsocks to assist with determining evacuation routes, alternate evacuation routes, muster points, and consideration for the decision to shelter-in-place. Additionally, the drills should exercise each evacuation alarm, emergency protective equipment, and emergency shutdowns, where appropriate.

  • 2024-03-I-VA-6Open - Acceptable Response or Alternate Response

    Add an alarm or alarms specific to ammonia releases, so that workers can properly respond to a release. The alarm response should be documented in the updated Emergency Action Plan, and may include multiple distinct alarms and responses, such as one for shelter-in-place and one for evacuation.

To International Institute of All-Natural Refrigeration (IIAR)

  • 2024-03-I-VA-1Open - Awaiting Response or Evaluation/Approval of Response

    Update ANSI/IIAR 2 to include guidance for preventing or mitigating liquid or two-phase atmospheric discharges from emergency pressure relief systems, such as the guidance in API Standard 521, Pressure-relieving and Depressuring Systems. At a minimum, the guidance should: a. Identify at-risk scenarios such as horizontal surge vessels and other vessels containing saturated liquid with little vapor space; b. Address design considerations and controls to reduce the likelihood of identified scenarios leading to overpressure or equipment failure and ensure vapor-liquid disengagement (the separation of vapor from liquid) during pressure relief for identified scenarios; and c. Require mitigative safeguards in cases where vapor-liquid disengagement during pressure relief cannot be reliably ensured. This should also include alternative disposal systems where applicable.

  • 2024-03-I-VA-2Open - Awaiting Response or Evaluation/Approval of Response

    Update ANSI/IIAR 2 to include a requirement to assess whether emergency pressure relief devices discharge to a safe location, such as with a dispersion analysis.

More release investigations