PEMEX Deer Park Chemical Release

Deer Park, TX · October 10, 2024

What happened

October 10, 2024, at approximately 4:30 p.m., a hydrogen sulfide release occurred at the PEMEX Deer Park facility’s amine recovery unit while workers were attempting to remove an isolation blind from piping that normally transports hydrogen sulfide gas. The incident caused two fatalities and 13 injuries.

Summary by the US Chemical Safety Board.

Lessons

Hominin's reading of what the investigation asks others to change. Each lesson names the recommendations it comes from.

  1. Mark exactly what is to be opened

    Workers were removing an isolation blind from piping that normally carries hydrogen sulfide. The plant was asked to label all piping in the units, and the engineers' society to set a standard practice for marking equipment for opening.

    From recommendations 2024-05-I-TX-1, 2024-05-I-TX-4

  2. Brief every worker who joins an isolated unit

    The plant was asked to make sure craftworkers brought into or out of a unit under positive isolation are told its hazards, safeguards and requirements.

    From recommendation 2024-05-I-TX-2

  3. Operational discipline has to be managed

    The plant was asked to set up a conduct of operations system that sets and enforces behavioral and performance metrics, following process safety center guidance.

    From recommendation 2024-05-I-TX-3

Safety recommendations

The CSB made 4 recommendations; 4 are still open.

To American Society of Mechanical Engineers (ASME)

  • 2024-05-I-TX-4Open - Awaiting Response or Evaluation/Approval of Response

    Develop written guidelines for marking equipment for opening. The guidelines should define a standard practice for equipment marking that includes clear identifiers of the area to be opened and means to remove the markings at the conclusion of the work.

To PEMEX Deer Park

  • 2024-05-I-TX-1Open - Awaiting Response or Evaluation/Approval of Response

    Label all piping in ARU6 and ARU7 in accordance with ANSI/ASME A 13.1 Scheme for the identification of Piping Systems.

  • 2024-05-I-TX-2Open - Awaiting Response or Evaluation/Approval of Response

    Develop procedures to ensure that any craftworkers introduced to or removed from a unit in Positive Isolation Status receive instructions that define the hazards, safeguards, and requirements of the unit associated with the work. The procedures should require each craftworker to receive clear communication on the identified hazards, control measures, and all other requirements before commencing work in a new area.

  • 2024-05-I-TX-3Open - Awaiting Response or Evaluation/Approval of Response

    Establish a conduct of operations system that establishes and enforces behavioral and performance metrics in accordance with CCPS’s Conduct of Operations and Operational Discipline. The system should include: a) the management commitment to process safety, b) employee input on policies and procedures, c) methods to ensure that policies and procedures can be effectively followed, to include, at a minimum: 1) permitting, 2) equipment marking, and 3) energy isolation procedures, and d) regular audits to verify adherence to conduct of operations metrics, to include, at a minimum: 1) performance expectations, 2) training, 3) management visibility, 4) leadership by example, and 5) worker knowledge and awareness.