Cranston, RI · February 7, 2003

What happened

On February 7, 2003, a worker was seriously injured in an explosion at Technic Inc. in Cranston, Rhode Island. The explosion occurred during maintenance on a ventilation system connected to multiple chemical reactors, evidently due to an accumulation of hazardous material inside. The plant manufactures precious metal processing chemicals.

Summary by the US Chemical Safety Board.

Safety recommendations

The CSB made 7 recommendations; none is still open.

To American Conference of Governmental Industrial Hygienists (ACGIH)

  • 2003-08-I-RI-7Closed - Acceptable Action

    Update the preliminary steps in the chapter on exhaust system design in the next revision of the Industrial Ventilation Manual, emphasizing the need to evaluate potential incompatibilities between dusts, fumes, or vapors that are likely to be intermixed in main header ducts of a ventilation system to ensure that they do not result in fire or explosion hazards, or destructive corrosion. Reference appropriate methods for such evaluations, such as the ASTM E 2012-00 standard.

To American Industrial Hygiene Association (AIHA)

  • 2003-08-I-RI-6Closed - Acceptable Action

    Revise the appendix of ANSI Z9.2, American National Standard Fundamentals Governing the Design and Operation of Local Exhaust Systems, emphasizing the need to evaluate potential incompatibilities when dusts, fumes, or vapors are intermixed in local exhaust ventilation systems with common headers to ensure that they do not result in fire or explosion hazards, or destructive corrosion. Reference appropriate methods for such evaluations, such as the ASTM E 2012-00 standard.

To National Fire Protection Association (NFPA)

  • 2003-08-I-RI-5Closed - Acceptable Action

    Revise the appendix of NFPA 91, Standard for Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Noncombustible Particulate Solids, emphasizing the need to evaluate potential incompatibilities when dusts, fumes, or vapors are intermixed in vent collection systems to ensure that they do not result in fire or explosion hazards, or destructive corrosion. Reference appropriate methods for such evaluations, such as the ASTM E 2012-00 standard.

To Technic Inc.

  • 2003-08-I-RI-1Closed - Unacceptable Action/No Response Received

    As a part of the engineering process, implement formal process safety review procedures for projects involving chemical processes- including the vent collection system. Incorporate a process hazard analysis, reactive chemical hazard evaluation, and design evaluation consistent with applicable codes and standards.

  • 2003-08-I-RI-2Closed - Unacceptable Action/No Response Received

    Implement a management-of-change program and ensure that reviews are conducted for any proposed changes to the vent collection system and its connected processes.

  • 2003-08-I-RI-3Closed - Acceptable Action

    Implement a preventive maintenance program for the vent collection system that includes regular inspections training and troubleshooting.

  • 2003-08-I-RI-4Closed - Acceptable Action

    Work with the Cranston Fire Department to improve the facility's emergency response plan, including emergency response procedures and interface with the surrounding community. Submit the plan to the fire department for review.