United States Steel Corporation Clairton Plant Coke Oven Explosion
Clairton, PA · August 11, 2025
What happened
On August 11, 2025, at approximately 10:45 a.m. local time, an explosion at the United States Steel Corporation Clairton Plant coke oven batteries 13 and 14 caused two fatalities and multiple injuries.
Summary by the US Chemical Safety Board.
Lessons
Hominin's reading of what the investigation asks others to change. Each lesson names the recommendations it comes from.
Know which buildings an explosion could reach
The plant was asked to evaluate the siting of every occupied and potentially occupied building at the coke works, and then to mitigate every siting hazard the evaluation documents.
From recommendations 2025-03-I-PA-1, 2025-03-I-PA-2
Cleaning gas piping needs a validated procedure
The plant and its contractor were asked to write procedures following the standard for preventing fires and explosions while cleaning and purging flammable gas piping, and the plant to analyse or validate its valve washing procedure.
From recommendations 2025-03-I-PA-3, 2025-03-I-PA-4, 2025-03-I-PA-7
Process safety needs a system and corporate oversight
The coke works was asked to build a comprehensive process safety management system, and Nippon Steel North America to set up a corporate process safety governance program for the facilities it is responsible for.
From recommendations 2025-03-I-PA-5, 2025-03-I-PA-6
Safety recommendations
The CSB made 7 recommendations; 7 are still open.
To MPW Industrial Services, Inc.
- 2025-03-I-PA-7Open - Awaiting Response or Evaluation/Approval of Response
Develop written policies and procedures in accordance with industry guidance such as NFPA 56 Standard for Fire and Explosion Prevention During Cleaning and Purging of Flammable Gas Piping Systems, governing cleaning piping systems containing flammable or toxic gas. Ensure that all workers who will or might participate in such operations are trained on the policies and procedures.
To Nippon Steel North America, Inc.
- 2025-03-I-PA-6Open - Awaiting Response or Evaluation/Approval of Response
Develop and implement a corporate process safety governance program to ensure the implementation of process safety management at applicable facilities. At a minimum, this program shall: a. include regular audits of subordinate facilities throughout the organization; b. require the documentation of process safety deficiencies, when identified, and prompt corrective action; and, c. incorporate industry guidance, such as the Center for Chemical Process Safety’s (CCPS) Guidelines for Implementing Process Safety Management, the CCPS’s Process Safety – Leadership from the Boardroom to the Frontline, and other industry good practice guidance publications.
To U.S. Steel Clairton Coke Works
- 2025-03-I-PA-1Open - Awaiting Response or Evaluation/Approval of Response
Conduct a siting evaluation for all occupied and potentially occupied buildings at the Clairton Coke Works facility. Utilize the guidance contained in the Center for Chemical Process Safety’s Guidelines for Evaluating Process Plant Buildings for External Explosions, Fires, and Toxic Releases, the American Petroleum Institute’s Recommended Practices 752, 753, and 756, and other industry good practice guidance documents.
- 2025-03-I-PA-2Open - Awaiting Response or Evaluation/Approval of Response
Using the results from the evaluation performed in 2025-03-I-PA-R1, ensure that all documented facility siting hazards are mitigated in accordance with the guiding principles contained in the American Petroleum Institute’s Recommended Practices 752, 753, and 756.
- 2025-03-I-PA-3Open - Awaiting Response or Evaluation/Approval of Response
Develop a written procedure in accordance with industry guidance such as NFPA 56 Standard for Fire and Explosion Prevention During Cleaning and Purging of Flammable Gas Piping Systems, for washing valve seats with pressurized water. Ensure that the procedure includes steps and other controls, including overpressure protection, to minimize the hazards of the operation. Ensure that workers who will or might perform the operation are involved in the development of the procedure and are trained on the procedure.
- 2025-03-I-PA-4Open - Awaiting Response or Evaluation/Approval of Response
Conduct a hazard analysis or safety validation of the written valve washing procedure in accordance with NFPA 56 Standard for Fire and Explosion Prevention During Cleaning and Purging of Flammable Gas Piping Systems. Ensure that workers who will or might perform the operation are involved in the analysis or validation.
- 2025-03-I-PA-5Open - Awaiting Response or Evaluation/Approval of Response
Develop a comprehensive process safety management system, incorporating guidance from the Center for Chemical Process Safety’s Guidelines for Risk Based Process Safety and other industry good practice guidance publications, and apply it to all coke oven gas processes at the Clairton facility.
More explosion and fire investigations
- Givaudan Sense Colour Explosion · Louisville, KY, 2024
- Dow Louisiana Operations Explosions · Plaquemine, LA, 2023
- Yenkin-Majestic Resin Plant Vapor Cloud Explosion and Fire · Columbus, OH, 2021
- Wendland 1H Well Fatal Explosion · Burleson County, TX, 2020