Equipment or structural failure
Bollard Failure Causing Breakaway of Cruise Ship Carnival Triumph from its Moorings, and Subsequent Collision with Dredge Wheeler and Towing Vessel Noon Wednesday
Mobile, AL · Mobile River · April 3, 2013
What happened
On April 3, 2013, about 1328 local time, the cruise ship Carnival Triumph was moored and undergoing repairs at the BAE Systems shipyard in Mobile, Alabama, when the Port of Mobile experienced a period of high wind gusts. The vessel broke free from its moorings and drifted across the Mobile River, where it collided with the moored dredge Wheeler. A responding towing vessel, Noon Wednesday, became pinned between the cruise ship and the dredge. One shipyard employee died in the accident; another was injured. The total damage amount was estimated to be more than $2.9 million.
Probable cause
The probable cause of the breakaway of the Carnival Triumph from its moorings and the subsequent collision with the dredge Wheeler and the towing vessel Noon Wednesday was the successive failure of multiple mooring bollards, which were known by BAE Systems to be in poor condition with an undetermined mooring load capability
More equipment or structural failure investigations
- Crane Wire Failure on Offshore Construction Vessel Island Venture and Subsequent Damage to Offshore Supply Vessel C-Enforcer · Port Fourchon, LA, 2025
- Collapse of Emissions Control Barge STAX 1 Capture and Control Articulated Arm · Los Angeles, CA · Port of Los Angeles, 2024
- Hull Failure and Implosion of Submersible Titan · 900 nm east of Cape Cod, Massachusetts · North Atlantic Ocean, 2023
- Collapse of Chalmette Refinery Dock Section During Docking of Ovide J Tow · Chalmette, LA · Lower Mississippi River, 2023
- Crane Fire on board Barge Kokosing V · Newport News, VA · James River, 2022