Skip to main content

Equipment or structural failure

Crane Wire Failure on Offshore Construction Vessel Island Venture and Subsequent Damage to Offshore Supply Vessel C-Enforcer

Port Fourchon, LA · April 3, 2025

What happened

On April 3, 2025, about 2145 local time, the offshore construction vessel Island Venture’s crane was being used to lift a wire reel from the back deck of the offshore supply vessel C Enforcer in Bayou Lafourche, Port Fourchon, Louisiana, when the crane’s hoisting wire parted, causing the reel to drop onto the C Enforcer’s main deck. There were no injuries, and no pollution was reported. Damage to the C Enforcer and Island Venture was estimated to be $3.8 million.

Probable cause

We determined that the probable cause of the failure of the hoisting wire on the offshore construction vessel Island Venture’s crane was internal corrosion of the crane’s hoisting wire.