Removal of Hazardous Material from Piping Systems

Safety bulletin or study · January 13, 2004

What happened

This Safety Bulletin identifies specific tasks that facilities should include in all work activities involving piping or equipment opening to ensure the complete removal of hazardous material. In addition, guidance is provided on implementing generic (plant-wide) procedures for nonroutine work activities. Related News CSB Releases Safety Bulletin Emphasizing Dangers of Working on Piping and Equipment That May Contain Flammable or Chemically Reactive Materials 7/15/2004 Related Documents Safety Bulletin Safety Bulletin - Removal of Hazardous Material from Piping Systems Inspector General Privacy Policy No Fear Act Legal/FOIA Performance and Accountability Reports Site Map 470 L'Enfant Plaza SW, Suite 604 #23278 | Washington, DC 20026 Website design & development by Americaneagle.com © U.S. Chemical Safety Board. All Rights Reserved. Close

Summary by the US Chemical Safety Board.

Safety recommendations

The CSB page lists no recommendations for this investigation.

More safety bulletin investigations