Marathon Martinez Renewable Fuels Fire
Martinez, CA · November 19, 2023
What happened
The incident involved a fire event at the Hydrodeoxygenation Unit recycle furnace. One operator sustained serious burn injures as a result of the fire.
Summary by the US Chemical Safety Board.
Lessons
Hominin's reading of what the investigation asks others to change. Each lesson names the recommendations it comes from.
Fired heaters need protection against afterburning and low flow
The fire was at a furnace in the renewable fuels unit. The facility was asked to add engineering safeguards that detect and prevent afterburning in that heater, and the company's heater standard to require protection against low process flow.
From recommendations 2024-01-I-CA-1, 2024-01-I-CA-6
Alarm operators when tube metal runs too hot
The company was asked to update its process heater limits standard with tube metal temperature alarms, and the petroleum institute to set requirements for the proper response to high tube metal temperature.
From recommendations 2024-01-I-CA-5, 2024-01-I-CA-2, 2024-01-I-CA-8
A site must meet its own company's policies
The facility was asked to assess itself against its parent company's policies on operating limits, hazard analysis and more, and the parent company to confirm the result with a full assessment.
From recommendations 2024-01-I-CA-4, 2024-01-I-CA-7
Safety recommendations
The CSB made 8 recommendations; 7 are still open.
To American Petroleum Institute (API)
- 2024-01-I-CA-8Open - Awaiting Response or Evaluation/Approval of Response
Revise API RP 556 Instrumentation, Control, and Protective Systems for Gas Fired Heaters, or successor API products, with the following: Requirements for proper response to high tube metal temperatures, including guidance to alert operators when safe operating limits are exceeded and to specify predetermined response actions, such as shutting down the fired heater remotely. The predetermined response actions must include actions that specify when to stop troubleshooting and remove personnel from the vicinity of the fired heater; Design requirements (“shall” rather than “should” language) for protecting fired heaters from low process flow where process piping diverges downstream of a flow meter. Requirements may include achieving proof of flow to the heater through valve position indicators and interlocks on branch Engineering safeguard requirements (“shall” rather than “should” language) to detect and prevent afterburning in fired heaters. These requirements may include the use of instrumentation such as combustibles measurements, flame detectors, and/or thermocouples that measure tube metal, flue gas, and process fluid temperatures. The requirements shall address monitoring capability from the control room.
To Marathon Martinez Renewables
- 2024-01-I-CA-1Closed - Acceptable Action
Implement engineering safeguards to detect and prevent afterburning in the fired heater involved in the November 19, 2023, incident. The safeguards may include the use of instrumentation such as combustibles measurements, flame detectors, and/or thermocouples that measure tube metal, flue gas, and process fluid temperatures. The safeguards shall be capable of being monitored from the control room.
- 2024-01-I-CA-2Open - Acceptable Response or Alternate Response
For the fired heater involved in the incident, after Marathon Petroleum Corporation’s “Process Heater Not-to-Exceed (NTE) Limits and Alarms” standard is updated according to 2024-01-I-CA-R5, implement tube metal temperature alarming consistent with corporate guidance to alert operators when safe operating limits are exceeded and to specify predetermined response actions, such as shutting down the fired heater remotely. The predetermined response actions must include actions that specify when to stop troubleshooting and remove personnel from the vicinity of the fired heater.
- 2024-01-I-CA-3Open - Acceptable Response or Alternate Response
Implement changes to improve Walk the Line performance at the Martinez facility by ensuring that the facility’s practices are consistent with tools in the AFPM Safety Portal and guidance in Marathon Petroleum Corporation’s refining reference document titled Operations Excellence. At a minimum: Require that operator field walkdowns ensure that valves are correctly aligned before all unit startup activities from planned or unplanned shutdowns, such as those due to non-normal operations, emergencies, turnarounds, and major maintenance; Improve policies and practices for communications among and between shifts to ensure that operators understand abnormal line-ups in their units; and Reinforce Walk the Line concepts, including the expectation for only trained operators to control valve line-ups at their units, through training for all levels of management in the Operations department.
- 2024-01-I-CA-4Open - Acceptable Response or Alternate Response
Complete a comprehensive gap assessment of the Martinez facility against Marathon Petroleum Corporation policies. At a minimum, address the following policies: a. Operating Limits; b. Process Hazard Analysis; and c. PSM/RMP Refining Operating Procedures. Develop and implement action items to effectively address findings from the assessment.
To Marathon Petroleum Corporation
- 2024-01-I-CA-5Open - Acceptable Response or Alternate Response
Update the corporate “Process Heater Not-to-Exceed (NTE) Limits and Alarms” standard with tube metal temperature alarming guidance to alert operators when safe operating limits are exceeded and to specify predetermined response actions, such as shutting down the fired heater remotely. The predetermined response actions must include actions that specify when to stop troubleshooting and remove personnel from the vicinity of the fired heater.
- 2024-01-I-CA-6Open - Acceptable Response or Alternate Response
Update the corporate “Heater Application Standard” with the following requirements: Requirements for protecting fired heaters from low process flow where process piping diverges downstream of a flow meter. Requirements may include achieving proof of flow to the heater through valve position indicators and interlocks on branch connections downstream of flow meters to prevent backflow, reverse flow, or other diverted flow scenarios that could defeat the safety instrumented system; and Engineering safeguard requirements to detect and prevent afterburning in fired heaters. The safeguards may include the use of instrumentation such as combustibles measurements, flame detectors, and/or thermocouples that measure tube metal, flue gas, and process fluid temperatures. The safeguards shall be capable of being monitored from the control room.
- 2024-01-I-CA-7Open - Acceptable Response or Alternate Response
Confirm the results of the Martinez facility’s comprehensive gap assessment required in 2024-01-I-CA-R4. Upon completion, conduct an Operations Excellence full assessment on the Martinez facility. Develop and implement action items to effectively address findings from the assessment.
More flammable vapor investigations
- Kleen Energy Natural Gas Explosion · Middletown, CT, 2010
- ConAgra Natural Gas Explosion and Ammonia Release · Garner, NC, 2009
- Veolia Environmental Services Flammable Vapor Explosion and Fire · West Carrollton, OH, 2009
- Little General Store Propane Explosion · Ghent, WV, 2007