Barge Breakaway and Contact with Webbers Falls Dam
Webbers Falls, OK · Arkansas River · May 23, 2019
What happened
On May 23, 2019, two loaded barges, the MTC 7256 and LTD 11140, struck the Webbers Falls Dam. The barges had broken away the previous day from a fleeting area on the Grand River in Muskogee, Oklahoma, during historic flood waters and high river current. The two barges were total constructive losses. No pollution was reported. Total damages exceeded $4.7 million, including the amount spent to remove the barges and repair the dam ($3,956,249).
Probable cause
The probable cause of the barge breakaway and contact with the Webbers Falls Dam was the force of the river current acting on the moored vessels at the Grand River fleeting area, which exceeded the capacity of the mooring wires, due to the extreme rise and flow of water in the Grand River as the Fort Gibson dam released major amounts of water in a short period of time.
More breakaway investigations
- Breakaway of Barge MPC 1056 and Subsequent Contact with Marina Docks · Evansville, IN · Ohio River, mile 797, 2025
- Breakaway of Barges MPC 907 and MPC 644 and Subsequent Contact with Mooring Cells · near Evansville, IL · Ohio River mile 794.1, 2024
- Barge Breakaway from Nell Womack Tow and Contact with Dock · West Memphis, AR · Lower Mississippi River, 2024
- Breakaway of Bulk Carrier Sirocco and Subsequent Collision with Moored Barge · Convent, LA · Lower Mississippi River Mile 160.4, 2023
- Breakaway of Moored Mobile Offshore Drilling Unit VALARIS DS-16 and Subsequent Collision with Cargo Vessel Akti · Pascagoula, MS · Bayou Casotte, Gulf of Mexico, 2022