Contact or allision

Contact of Dewey R Tow with CSX Railroad Bridge Protection Cell

Summit, IL · Chicago Sanitary and Ship Canal · April 13, 2019

What happened

On April 13, 2019, the Dewey R was pushing a tow at mile 312.3 on the Chicago Sanitary and Ship Canal in Summit, Illinois, when the lead barge, ATC 3404, struck a protection cell on the south side of the CSX Railroad Bridge. The protection cell was displaced about 4 feet and impacted the southern concrete pier of the bridge. There were no reports of injuries, pollution, or water ingress. The cost of repairs to the barge was $162,104, and the estimated cost of repairs to the bridge protection cell and bridge pier was $813,980.

Probable cause

The probable cause of the contact of the Dewey R ’s lead barge with the south-side protection cell for the CSX Railroad Bridge was the pilot’s departure from the centerline of the channel as the tow approached the bridge without a forward look-out to monitor the transit.

Lessons learned, as the NTSB states them

Safe Transits Through Bridges

Operators should exercise extreme caution when maneuvering through bridges and should consider assigning additional personnel to perform look-out duties and monitor the transit.